Register / Login

Loading...

Document Search

Use Document search to find words or phrases in any publicly-available complaint documentation, including complaint filings, eligibility determinations, appraisals, agreements, compliance reports, monitoring reports, and more. Each result links back to its relevant complaint as well as the document itself. Contact us if you have any questions or need any help.

Search Terms

Filter By:

Clear

2 Results

Showing Only Power Sector Generation and Restructuring Project (Show All Results)

Top Results By:

  1. Complaint > Power Sector Generation and Restructuring Project

    Project Document: 46-Implementation Completion Report Review

    ...unknown engineering designs for which the Government/KESH are now in the process of hiring an engineering firm to prepare design and bidding documents with plans to issue them in September 2013. Additionally, there is a high risk that the plant's off shore lines (cooling water intake and fuel line) will be increasingly vulnerable to ever more severe weather events. The project was not in commission to address the summer 2012 drought, for instance. Also, there is no more project funding ava...

    WB Inspection Panel - Albania - 2013
  2. Complaint > Power Sector Generation and Restructuring Project

    Compliance Report: 46-Investigation Report (English)

    ...unknown and were not considered. The PAD contains no discussion or description of the project area’s demography and local economy, or of the Vlora community itself, as required by OMS 2.20.238 235. The omission of social assessment has compounded the non-compliance with the Bank policy requirement of consulting the area population and learning from its concerns.239 The Panel reviewed the essential project documents and found that in ...

    WB Inspection Panel - Albania - 2007