Register / Login

Loading...

Document Search

Use Document search to find words or phrases in any publicly-available complaint documentation, including complaint filings, eligibility determinations, appraisals, agreements, compliance reports, monitoring reports, and more. Each result links back to its relevant complaint as well as the document itself. Contact us if you have any questions or need any help.

Search Terms

Filter By:

Clear

3 Results

Showing Only Project Document (Show All Results)

Top Results By:

  1. Complaint > Power Sector Generation and Restructuring Project

    Project Document: 46-Implementation Completion Report Review

    ...unknown engineering designs for which the Government/KESH are now in the process of hiring an engineering firm to prepare design and bidding documents with plans to issue them in September 2013. Additionally, there is a high risk that the plant's off shore lines (cooling water intake and fuel line) will be increasingly vulnerable to ever more severe weather events. The project was not in commission to address the summer 2012 drought, for instance. Also, there is no more project funding ava...

    WB Inspection Panel - Albania - 2013
  2. Complaint > Gibe III Hydroelectric Power Project

    Project Document: FINAL DRAFT REPORT ON SOCIO – ECONOMIC ANALYSIS AND PUBLIC CONSULTATION OF LAKE TURKANA COMMUNITIES IN NORTHERN KENYA

    ...unknown in search of pasture for the livestock. The study, as a result, was affected as the energetic section of the community members were away and hence their views may not have fully been reflected. Vast, rough, unclear terrain, and poor infrastructure where available Most of the roads are seasonal and only passable during certain times. This made travelling from place to place very difficult, the villages were located far from each other and roads were unclear and definite landmarks ...

    AfDB Independent Recourse Mechanism - Ethiopia - 2009
  3. Complaint > Petroleum Development and Pipeline Project, Management of the Petroleum Economy Project, and Petroleum Sector Management Capacity Building Project

    Project Document: Chad-Cameroon Petroleum Development and Pipeline Project Program Performance and Assessment Report

    ...unknown and there were no provisions (for example, through surveys) to evaluate it. There were also iags in the monitoring o f construction funding and compliance with covenants. Internal evaluation o f the PDPP (ICR, 67 Based on information from the ECMG reports from 2005, among other sources, IFC considers that the infill drilling began in 2005, whereas EEPCI states that the infill drilling began in mid-2008, and the additional wells drilled between 2003 and 2008 were development wel...

    WB Inspection Panel - Chad - 2009