Register / Login

Loading...

Document Search

Use Document search to find words or phrases in any publicly-available complaint documentation, including complaint filings, eligibility determinations, appraisals, agreements, compliance reports, monitoring reports, and more. Each result links back to its relevant complaint as well as the document itself. Contact us if you have any questions or need any help.

Search Terms

Filter By:

Clear

45 Results

Showing Only Filing (Show All Results)

Top Results By:

Show All

  1. Complaint > Water and Sanitation Service Improvement Project and Water and Sanitation Service Improvement Project - Additional Financing

    Filing: 115-Request for Inspection-26Nov2016

    ...Unknown MESCO 0.4 Maragua Maragua 3.68 Unknown (1) NOTE : TANA HEP STATION ALSO HAS AN INTAKE ON THE TANA RIVER DRIVING A SEPARATE SET OF TURBINES WITH 8MW INSTALLED CAPACITY. Source: TNWSP – Northern Collector Feasibility Study Report by Howard Humphreys, 1998 Wanjii hydroelectric power plant is located near Murang’a town approximately 90km from Nairobi and comprises four horizontally mounted turbine generat...

    WB Inspection Panel - Kenya - 2017
  2. Complaint > Vishnugad Pipalkoti Hydro Electric Project

    Filing: Request for Inspection (English)

    1 To, Executive Secretary, The Inspection Panel 1818 H Street, NW, Washington, DC 20433, USA Sir: Kindly find attached a request for Inspection of the Loan to THDC India Limited for the Vishnugad Pipalkoti Hydro Electric Project. The following documents are attached, please. Sl Details Page No Nos 1 Request from and o...

    WB Inspection Panel - India - 2012
  3. Complaint > Productive Infrastructure Program - Request II: Caracol Industrial Park (MICI)

    Filing: Complaint

    ...unknown. HA-T1179 is meant to assess water availability, quality, and an integrated water resources management in Northern Haiti: HA-L1101 ESS ¶¶2.7-2.8, 4.16-4.17. 339 ActionAid (2015), p. 13: “residents complained that too much water was being captured in the park in light of the 2014 drought.” In an interview, Ilna St Jean reported that a nearby well has run dry and that there is less water in the Trou-du-Nord river, impacting fish (11 July 2016, available on request). 340 See footnot...

    IDB Independent Consultation and Investigation Mechanism - Haiti - 2017
  4. Complaint > Kosovo Power Project (Proposed)

    Filing: 78-Request for Inspection (English)

    ...unknown   and   that   the   per   capita   GNI   for   Kosovo   is   so   low   (i.e.,   $3,300   according   to   IFC’s   Doing   Business   2012),   this   method   was   determined   not   to   provide  an  accurate  estimate.   4  Based  on  an  analysis  carried  out  by  Vattenfall  of  the  new  mine  to  serve  the  new  power  station...

    WB Inspection Panel - Kosovo - 2012
  5. Complaint > Rio Bogota Environmental Recuperation and Flood Control Project

    Filing: 108-Request for Inspection

    ...unknown. That flaw affects the evaluation of negative impacts and compensation, for without an in-depth study on wildlife it is impossible to know the negative impacts of the plant expansion project and the Metropolitan Park, including the transfer of wildlife and the determination of whether the compensation proposal can actually repair the environmental losses. The visits made to the community have allowed us to see many curis, nests and droppings of this native species of the wetlands ...

    WB Inspection Panel - Colombia - 2016
Previous | Next