Register / Login

Loading...

Document Search

Use Document search to find words or phrases in any publicly-available complaint documentation, including complaint filings, eligibility determinations, appraisals, agreements, compliance reports, monitoring reports, and more. Each result links back to its relevant complaint as well as the document itself. Contact us if you have any questions or need any help.

Search Terms

Filter By:

Clear

444 Results

Top Results By:

Show All

  1. Complaint > West African Gas Pipeline Project

    Management Response: 40-Management Report and Recommendation (English)

    ...vice. 63. WAPCo’s action plan developed during the December 2007 supervision mission and reflected in Annex 4 includes 12 recommended actions based in whole or in part on the ESAP report, of which six are in the process of being implemented and six have already been completed (see Annex 1, Item 17). In addition, ESAP experts provided specialized advice, when requested by WAPCo or the Bank, on a number of implementation issues: the safety expert recommended a methodology for analyzing the ri...

    WB Inspection Panel - Ghana, Nigeria - 2006
  2. Complaint > Vishnugad Pipalkoti Hydro Electric Project

    Filing: Request for Inspection (English)

    ...Vice President, South Asia Department, World Bank on violation of Operational Policies in grant of loan to THDC India for Vishnugad-Pipalkoti Hydro Electric Project By Prof Varun Arya, Formerly President, IIT Delhi Alumni Association Kisor Chaudhuri, FRGS, Biogeographer, Haridwar; Phone: 9458947930 Sudarshan Chhotoray, Film Maker, Bhubaneswar Jaya Prakash Dabral, M.B.A., Faculty of Management Studies, University of Delhi, Pre...

    WB Inspection Panel - India - 2012
  3. Complaint > DRC High Priority Roads Reopening and Maintenance (2nd Additional Financing)

    Compliance Report: Inspection Panel Investigation Report(English)

    ...vices to the IDP camp have now been restored and is investigating why it took so long to restore service, what potential impacts have been generated by the interruption of water services, and what measures may be required to mitigate such impacts.”267 3.3.3 Bank Policies 184. Bank Policy on Environmental Assessment (OP/BP 4.01) requires the EA to take into account the natural environment (air, water, and land), human health and safety, social aspects (involuntary resettlement, indigenous pe...

    WB Inspection Panel - Democratic Republic of Congo - 2017
  4. Complaint > Amaravati Sustainable Capital City Development Project

    Eligibility: Inspection Panel Third Report and Recommendation(English)

    ...vices through the gains from higher land values and the rezoning of land to residential/commercial use. Where used appropriately, LP is a means to manage city expansion and to minimize ad hoc sprawl on urban fringes. Typically, the resulting land assembled through LP is of higher density and better serviced (with properly sized roads, better connectivity, amenities and basic services) than the earlier individual land parcels. Global experience. The use of LP as an instrument for land assemb...

    WB Inspection Panel - India - 2017
Previous | Next