Register / Login

Loading...

Document Search

Use Document search to find words or phrases in any publicly-available complaint documentation, including complaint filings, eligibility determinations, appraisals, agreements, compliance reports, monitoring reports, and more. Each result links back to its relevant complaint as well as the document itself. Contact us if you have any questions or need any help.

Search Terms

Filter By:

Clear

189 Results

Top Results By:

Show All

  1. Complaint > Rio Bogota Environmental Recuperation and Flood Control Project

    Filing: 108-Request for Inspection

    ...unknown. That flaw affects the evaluation of negative impacts and compensation, for without an in-depth study on wildlife it is impossible to know the negative impacts of the plant expansion project and the Metropolitan Park, including the transfer of wildlife and the determination of whether the compensation proposal can actually repair the environmental losses. The visits made to the community have allowed us to see many curis, nests and droppings of this native species of the wetlands ...

    WB Inspection Panel - Colombia - 2016
  2. Complaint > Downtown Redevelopment, Modernization of Metropolitan Public Transport, and of Government Offices Project

    Compliance Review: Public Release of the Compliance Review Report and final decision by the Board of Executive Directors

    ...unknown (ESMR), October 2010 date. Source: Prepared by the MICI based on various documents obtained during the investigation. e. What does the Access to Information Policy of 2010 (OP-102) establish? 2.299 With the approval of Operational Policy OP-102 of 2010, the Bank reaffirmed “its commitment to transparency in all aspects of its operations.” The objective of the policy is to enhanc...

    IDB Independent Consultation and Investigation Mechanism - Paraguay - 2018
  3. Complaint > Nicaragua Sugar Estates Limited-01/Leon and Chinandega

    Agreement: Informe

    ...Unknown1 (Hongo) 26 Tabla 3: Resumen de Agroquímicos usados actualmente en el ISA y sus potenciales efectos en la salud (Continuación) Periodo Ingrediente Peligros para la Salud reportados por agencias Agroquímico ...

    IFC Compliance Advisor/Ombudsman - Nicaragua
  4. Complaint > Eskom Investment Support Project

    Compliance Report: 65-Investigation Report (English)

    ...unknown, storage capacity of the Mokolo Reservoir. 208 Management response email July 11th, 2011. 209 This provision is echoed in the PAD, p. 215, which notes that if sufficient water were not available to Eskom, the Bank would recommend that Eskom ―investigate the feasibility of using a less water intensive, dry FGD technology prior to commencing full operation.‖ 210 The PAD (p. 217, para. 70, Annex II) refers to an eventual ―independent feasibility analysis of alternative control t...

    WB Inspection Panel - South Africa - 2010
  5. Complaint > Power Sector Generation and Restructuring Project

    Compliance Report: 46-Investigation Report (English)

    ...unknown and were not considered. The PAD contains no discussion or description of the project area’s demography and local economy, or of the Vlora community itself, as required by OMS 2.20.238 235. The omission of social assessment has compounded the non-compliance with the Bank policy requirement of consulting the area population and learning from its concerns.239 The Panel reviewed the essential project documents and found that in ...

    WB Inspection Panel - Albania - 2007
  6. Complaint > Rondonia Natural Resources Management Project

    Eligibility: Inspection Panel Report and Recommendation

    ...unknown number of squatters @osseiros) of different categories. 3.7 However, since the area affected by these groups was SU quite-small in relation to the total area of these Zones,the State Government decided to proceed with the establishment of conservation units, forests and extractive reserves, and protection of indigenous reserves, and to begin enforcement of the zoning as soon as possible, in order to halt further...

    WB Inspection Panel - Brazil - 1995
  7. Complaint > Western Poverty Reduction Project

    Compliance Report: 16-Investigation Report (English)

    ...unknown. In general it may be accepted that the extemely harsh and cold winters of the Project area will prevent most agricultural pests from getting out of control. The PAD and the Management Response make it clear that no Bank funds will be used for the procurement of pesticides, but these will be provided by the borrower as counterpart funds for the Project and must therefore be interpreted as part of a Bank-funded project. 242. The statement in the Management Response (p.75) that ther...

    WB Inspection Panel - China - 1999
  8. Complaint > North-South Corridor (Kvesheti-Kobi) Road Project

    Compliance Report: CRP's Final Report (English)

    ...unknown reasons this component did not eventually form part of the Boardapproved project. However, the EIA states that the present Zakatkari-Gudauri road will be suitably strengthened for use as an access road to the Didveli Plateau. The CRP notes that this section of the Zakatkari-Gudauri road (whether it is the proposed all-weather road or the existing road, upgraded for construction traffic purposes) will connect Gudauri to the Khada Valley via an arched bridge to be constructed under the...

    ADB Special Project Facilitator and Compliance Review Panel - Georgia - 2023
  9. Complaint > Petroleum Development and Pipeline Project, Management of the Petroleum Economy Project, and Petroleum Sector Management Capacity Building Project

    Project Document: Chad-Cameroon Petroleum Development and Pipeline Project Program Performance and Assessment Report

    ...unknown and there were no provisions (for example, through surveys) to evaluate it. There were also iags in the monitoring o f construction funding and compliance with covenants. Internal evaluation o f the PDPP (ICR, 67 Based on information from the ECMG reports from 2005, among other sources, IFC considers that the infill drilling began in 2005, whereas EEPCI states that the infill drilling began in mid-2008, and the additional wells drilled between 2003 and 2008 were development wel...

    WB Inspection Panel - Chad - 2009
Previous | Next